Support for Collective Irrigation Infrastructure (Baden-Württemberg)
Original title (DE): Förderung Gemeinschaftlicher Bewässerungsinfrastruktur
What it funds
A measure specifically dedicated to irrigation: it funds the construction of collective irrigation and livestock-watering infrastructure from the water abstraction point to the delivery point at the farm, to address increasing drought and reduced water availability. Conceptual planning and preliminary surveys are also eligible. Complete applications must reach the territorially competent Regierungspräsidium by the selection dates. The 2026 dates are 29 May, 24 July and 2 October, the latter being the next one available.
Who can apply
Public-sector bodies only: municipalities and their associations, public water and soil boards (Wasser- und Bodenverbände) based in Baden-Württemberg. Individual farms cannot apply directly.
Notes and caveats
For an Italian company such as Agrostar this measure matters as an indirect market (supplying municipalities and water boards as contracting clients), not as aid it can obtain itself: beneficiaries are exclusively public bodies. The 29 May and 24 July 2026 dates have already passed; the next selection date is 2 October 2026.
Sources
Every piece of information on this page was read on 27 August 2026 from the pages below. Where they disagree, the managing body’s document prevails.
Keywords
adattamento climaticoinfrastrutture idricheirrigazione